By Juanice Gray, jgray@natchitochestimes.com
School Board member Eugene Garner said construction and renovations are underway at Goldonna School.

New air conditioning units are being installed to replace some older, less efficient units and the foundation has been prepared to pour concrete for an outdoor basketball court.The court will also be covered so students can utilize the court even in inclement weather.

Garner said lighting is being updated with new switches that will automatically turn off when there is no activity in the room for a predetermined period of time. This will result in utility savings.

Other renovations include the addition of a new computer lab for the junior high, new flooring in some classrooms in the elementary and renovations to restrooms in the upper class building.

The first and most visible aspect of the renovations will be the parking lot. A portion of the lot was taken up to allow workers to replace the storm drain. The parking lot will be resurfaced once the drain is in place.

